A Preventive Maintenance Model Subject to Sequential Inspection for a Three-Stage Failure Process

Volume 15, Number 1, January 2019, pp. 76-87
DOI: 10.23940/ijpe.19.01.p8.7687

Xiaoxiao Caoa, Chao Guoa, Huasheng Xionga,b,c, Duo Lib, and Xiaojin Huangc

aInstitute of Nuclear and New Energy Technology of Tsinghua University, Beijing, 100084, China
bCollaborative Innovation Center of Advanced Nuclear Energy Technology, Beijing, 100084, China
cKey Laboratory of Advanced Reactor Engineering and Safety of Ministry of Education, Beijing, 100084, China

(Submitted on October 6, 2018; Revised on November 11, 2018; Accepted on December 17, 2018)

Abstract:

For a system subject to gradual degradation, it can be in one of three different states: normal, minor defective, or severe defective stages, which can overall be referred to as a three-stage failure process. For this system, periodic inspection may not be the most ideal policy. Fewer inspections will lead to lower costs if the system is in the normal stage, but if the system is in the defective stage, frequent inspections are recommended to prevent failure. Therefore, it may be more economical to take the sequential time   as the inspection interval. In view of this, a preventive maintenance (PM) model subject to sequential inspection for a three-stage failure process is proposed. Two-level sequential inspections, postponed maintenance and opportunistic maintenance (OM), are introduced into the PM model. The minor inspection is taken at the successive time, and Minor inspection is an imperfect inspection that can identify the minor defective stage with a certain probability but can reveal other two stages completely. The nth major inspection is taken to substitute for the Anth  minor inspection, and Major inspection is a perfect inspection that can distinguish the state of the system perfectly. Once the severe defective stage is identified, the inspection is stopped and the maintenance action is postponed to the next OM if the time to the next OM is less than a threshold level; otherwise, the system is maintained immediately. A numerical example is given to demonstrate the proposed model by comparing with other models and analysing the influence of the parameters on the expected cost.

 

References: 22

      1. T. Nakagawa, “Maintenance Theory of Reliability,” Springer London, 2005
      2. T. Nakagawa and S. Mizutani, “A Summary of Maintenance Policies for a Finite Interval,” Reliability Engineering & System Safety, Vol. 94, No. 1, pp. 89-96, January 2009
      3. A. Akbarov, A. H. Christer, and W. Wang, “Problem Identification in Maintenance Modelling: A Case Study,” International Journal of Production Research, Vol. 46, No. 4, pp. 1031-1046, February 2008
      4. A. Pillay, J. Wang, A. D. Wall, and T. Ruxton, “A Maintenance Study of Fishing Vessel Equipment using Delay‐Time Analysis,” Journal of Quality in Maintenance Engineering, Vol. 7, No. 2, pp. 118-128, June 2001
      5. W. Wang, “An Inspection Model based on a Three-Stage Failure Process,” Reliability Engineering & System Safety, Vol. 96, No. 7, pp. 838-848, January 2011
      6. A. H. Christer and W. M. Waller, “Reducing Production Downtime using Delay-Time Analysis,” Journal of the Operational Research Society, Vol. 35, No. 6, pp. 499-512, June 1984
      7. A. H. Christer, “Delay-Time Model of Reliability of Equipment Subject to Inspection Monitoring,” Journal of the Operational Research Society, Vol. 38, No. 4, pp. 329-334, April 1987
      8. W. Wang, “An Overview of the Recent Advances in Delay-Time-based Maintenance Modelling,” Reliability Engineering & System Safety, Vol. 106, pp. 165-178, October 2012
      9. V. C. C. Oosterom, A. A. Elwany, D. D. Celebi, and V. G. G. Houtum, “Optimal Policies for a Delay Time Model with Postponed Replacement,” European Journal of Operational Research, Vol. 232, pp. 186, January 2014
      10. H. Wang, W. Wang, and R. Peng, “A Two-Phase Inspection Model for a Single Component System with Three-Stage Degradation,” Reliability Engineering & System Safety, Vol. 158, pp. 31-40, February 2017
      11. W. Wang, F. Zhao, and R. Peng, “A Preventive Maintenance Model with a Two-Level Inspection Policy based on a Three-Stage Failure Process,” Reliability Engineering & System Safety, Vol. 121, pp. 207-220, January 2014
      12. L. Yang, X. Ma, Q. Zhai, and Y. Zhao, “A Delay Time Model for a Mission-based System Subject to Periodic and Random Inspection and Postponed Replacement,” Reliability Engineering & System Safety, Vol. 150, pp. 96-104, June 2016
      13. L. Yang, X. Ma, and Y. Zhao, “A Condition-based Maintenance Model for a Three-State System Subject to Degradation and Environmental Shocks,” Computers & Industrial Engineering, Vol. 105, pp. 210-222, March 2017
      14. T. Nakagawa, S. Mizutani, and M. Chen, “A Summary of Periodic and Random Inspection Policies,” Reliability Engineering & System Safety, Vol. 95, No. 8, pp. 906-911, August 2010
      15. S. Taghipour and D. Banjevic, “Periodic Inspection Optimization Models for a Repairable System Subject to Hidden Failures,” IEEE Transactions on Reliability, Vol. 60, No. 1, pp. 275-285, March 2011
      16. S. Taghipour, D. Banjevic, and A. K. S. Jardine, “Periodic Inspection Optimization Model for a Complex Repairable System,” Reliability Engineering & System Safety, Vol. 95, No. 9, pp. 944-952, September 2010
      17. S. Taghipour and M. L. Kassaei, “Periodic Inspection Optimization of a k-out-of-n Load-Sharing System,” IEEE Transactions on Reliability, Vol. 64, No. 3, pp. 1116-1127, September 2015
      18. L. R. Cui, H. T. Loh, and M. Xie, “Sequential Inspection Strategy for Multiple Systems under Availability Requirement,” European Journal of Operational Research, Vol. 155, No. 1, pp. 170-177, May 2004
      19. R. E. Barlow and F. Proschan, “Mathematical Theory of Reliability,” J Wiley & Sons, New York, 1965
      20. R. Jiang, “Optimization of Alarm Threshold and Sequential Inspection Scheme,” Reliability Engineering & System Safety, Vol. 95, No. 3, pp. 208-215, March 2010
      21. R. J. Rohrer and C. F. Nierode, “Simple Method for Risk Assessment of Nuclear Power Plant Refueling Outages,” Nuclear Engineering & Design, Vol. 167, No. 2, pp. 193-201, November 1996
      22. M. D. Berrade, P. A. Scarf, and C. A. V. Cavalcante, “A Study of Postponed Replacement in a Delay Time Model,” Reliability Engineering & System Safety, Vol. 168, pp. 70-79, December 2017

           

          Please note : You will need Adobe Acrobat viewer to view the full articles.Get Free Adobe Reader

           
          This site uses encryption for transmitting your passwords. ratmilwebsolutions.com