Reliability Analysis of Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity
A. G. MATHEW1, S. M. RIZWAN2, M. C. MAJUMDER3, K. P. RAMACHANDRAN4, and G. TANEJA5
1, 4 Department of Mechanical and Industrial Engineering, Caledonian College of Engineering, Oman 2 Department of Mathematics and Statistics, Caledonian College of Engineering, Oman 3 Department of Mechanical Engineering, National Institute of Technology, Durgapur, India 5 Department of Statistics, MD University, Rohtak, India
A. G. MATHEW, S. M. RIZWAN, M. C. MAJUMDER, K. P. RAMACHANDRAN, and G. TANEJA. Reliability Analysis of Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity [J]. Int J Performability Eng, 2011, 7(2): 179-187.