Human Reliability Evaluation of Assembly Production Line

Volume 14, Number 12, December 2018, pp. 3109-3117
DOI: 10.23940/ijpe.18.12.p20.31093117

Jiajia Zhao, Ruying Pang, and Shuyao Zhang

Department of Industrial Engineering, Inner Mongolia University of Technology, Hohhot, 010010, China

(Submitted on September 10, 2018; Revised on October 14, 2018; Accepted on November 16, 2018)

Abstract:

To ensure the efficient and stable operation of a whole production line, the reliability evaluation of assembly line is studied. In this paper, the LEC method is used to evaluate the human factor reliability of the assembly line production efficiency and its stability. To reduce the subjectivity of the LEC method and make the evaluation more objective, this paper used the objective reliability and error analysis (CREAM) to calculate objectively the rate of human error, while carrying out the evaluation of the possibility L of work suspension accidents. At the same time, the two indexes of E and C were modified and improved. The proposed evaluation model is applied and verified to the automobile assembly line. The result shows that it has certain feasibility and reference value.

 

References: 19

                    1. X. W. Zhang, “Opportunity Maintenance of a Series-Parallel System Considering Production Line Balance,” Ph.D. Dissertation, Shanghai Jiao Tong University, 2015
                    2. Y. Lin, S. H. Wang, and L. X. Zhang, “Study on Design and Reliability of Buffer Inventory in Tandem Repairable Production Line,” Mechanical Design and Manufacturing, No. 4, pp. 104-107, 2017
                    3. B. Liao, Q. Yang, and M. Lu, “Study on Prediction Model of Human Failure Probability based on CREAM Method,” China Safety Science and Technology of Production, Vol. 8, No. 7, pp. 46-50, 2012
                    4. Q. Zhang and G. S. Deng, “Research on Radial Basis Function Neural Network Evaluation Model for Human Reliability of Coal Mine Operators,” Safety Science and Technology of China, Vol. 5, pp. 142-147, 2015
                    5. W. J. Gu, “An Auto Parts Company Production Line based on the Maintenance of RCM,” Ph.D. Dissertation, Shanghai Jiao Tong University, 2011
                    6. W. Xu and Y. J. Feng, “Application and Improvement of LEC Evaluation Method in Operational Risk Identification,” Chemical Industry Management, No. 1, pp. 195-195, 2014
                    7. P. Liang, S. H. Wang, and X. J. Dong, “Reliability Research on Prevention Repair of Serial Production Line,” Machinery Design & Manufacture, 2015
                    8. M. Li, “Changchun Hella Headlight PC Production Line Reliability Project Design,” Ph.D. Dissertation, Jilin University, 2015
                    9. G. Fan, A. Li, Y. Zhao, Y. X. Zhao, and M. Giovanni, “Human Factors’ Complexity Measurement of Human-based Station of Assembly Line,” Human Factors & Ergonomics in Manufacturing, 2018
                    10. B. Liu, “Engine Cylinder Flexible Production Line Reliability Assessment Method,” Ph.D. Dissertation, Jilin University, 2015
                    11. F. He, K. Shen, and T. Y. Xia, “Research on Structural Reliability Analysis of Key Equipment in Spray Granulation Production Line,” Journal of Agronomy, Vol. 38, No. 7, pp. 40-44, 2017
                    12. Q. Li, “Analysis of Reliability Distribution of Engine Block Production Line Considering Caching Factors,” Ph.D. Dissertation, Jilin University, 2017
                    13. Q. Ji and N. Li, “Application of LEC Evaluation Method in Risk Assessment of Occupational Hazards in Construction Projects,” Occupational Health and Emergency Rescue, Vol. 29, No. 5, pp. 260-262, 2011
                    14. X. Wu, “Research on Complexity Optimization of Human-based Mixed-Flow Assembly System,” Ph.D. Dissertation, Tianjin University, 2012
                    15. X. Z. Cui, C. Ming, and G. X. Wang, “FMECA-based Analysis of the Headless Machine Plus Production Line Failure,” Combined Machine Tool and Automation Processing Technology, No. 1, pp. 149-152, 2014
                    16. R. S. Sun and X. Wang, “Application of CREAM Error Probability Prediction Method in Cockpit Crew Judgment and Decision Process,” China Safety Science and Technology, Vol. 6, No. 6, pp. 40-45, 2010
                    17. G. Z. Bai, “Research on the Improvement of Traveling Wave Tube Quality and Reliability,” Ph.D. Dissertation, University of Chinese Academy of Sciences, 2016
                    18. C. Song, J. X. Yu, and W. L. Ma, “Analysis of Human Factors Reliability based on Cream and Uncertainty Inference,” Journal of Tianjin University (Natural Science and Engineering Edition), No. 11, pp. 958-962, 2012
                    19. G. L. Wu, “Pearl River Brewing Company Production Safety Human Factors Reliability,” Ph.D. Dissertation, South China University of Technology, 2010

                                       

                                      Please note : You will need Adobe Acrobat viewer to view the full articles.Get Free Adobe Reader

                                       
                                      This site uses encryption for transmitting your passwords. ratmilwebsolutions.com