|
[1] Boutry, M. Building of Indicators (http://www.univ-nancy2.fr/Amphis/images/19/64/Gest- Qual_ConstructionIndicateurs.pdf ) 2007.
|
|
[2] Razzak, M.A., G. Daley, and J.P. Dismukes. Factory Level Metrics: Basis for Productivity Improvement. Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM2002), Tempe, Arizona, April 10-12, 2002; 158-162.
|
|
[3] Huang, S.H., J.P. Dismukes, J. Shi, Q.I. Su, M.A. Razzak, R. Bodhale and D.E. Robinson. Manufacturing Productivity Improvement Using Effectiveness Metrics and Simulation Analysis. International Journal of Production Research, 2003; 41(3):513-527.
|
|
[4] Kombé,T., E. D. Efaga, B. Ndzana and E. Niel. Efficiency of a system Built on the overall OEE by continuing the reliability diagram. Revue internationale Afrique Science, june 2006; 2(2) : 198 – 211.
|
|
[5] Bouziane, M. Introduction of the Overall Equipment Effectiveness (OEE) Among the Indicators of Sustainable Development. International Conference on Energy and Sustainable Development, Alger, November 29-30, 2011; 1-4.
|
|
[6] Jaulent, P. Pertinence of Indicators, Pertinence of Targets: Some Councils. (http://www.finyear.com/Pertinence-des-indicateurs-pertinence-des-cibles-quelquesconseils_a14896.html) 2010.
|
|
[7] Business Link UK. Measure performance and set targets. (http://www.infoentrepreneurs.org/fr/guides/bl---mesure-du-rendement-et-fixation-de-cibles/#8) 2009.
|
|
[8] French standard (FS). Means of production - Indicators of performances - Overall Equipment Effectiveness (OEE) - Total Equipment Effectiveness Performance (TEEP) - production equipment Effectiveness (PEE). Afnor, French, E-60-182. 2002
|
|
[9] Chen, S.J., C.L. Hwang and F. P. Hwang. Fuzzy Multiple Attribute Decision Making Methods and Applications. Lecture Notes in Economics and Mathematical Systems. Springer-Verlag, Berlin, 1992.
|