Int J Performability Eng ›› 2014, Vol. 10 ›› Issue (6): 659-661.doi: 10.23940/ijpe.14.6.p659.mag
• Short Communications • Previous Articles
JUSTIN R CHIMKA and HENG DU
Abstract:
We use Markov chains to compare run lengths of Poisson process individuals control charts with and without runs rules. Evidence quantifies the advantage of runs rules for certain cost structures z = Ca / Cb, where Ca is the cost of a Type I error, and Cb is the cost of a Type II error, and different shifts from in-control parameter l1 to out-of-control parameter l2.
JUSTIN R CHIMKA HENG DU. Control Charts with Runs Rules for Poisson Process Data [J]. Int J Performability Eng, 2014, 10(6): 659-661.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
/ / Recommend
URL: https://www.ijpe-online.com/EN/10.23940/ijpe.14.6.p659.mag
https://www.ijpe-online.com/EN/Y2014/V10/I6/659