[1] |
D.T. Chiang and S. C. Niu, “Reliability of Consecutive-k-out-of-n: F System,” IEEE Transactions on Reliability, Vol. 30, No. 1, pp. 87-89, 1981
doi: 10.1109/TR.1981.5220981
|
[2] |
G. J. Chang, F. H. Wang, L. Cui , “Reliabilities of Consecutive-k Systems, ” Handbook of Reliability Engineering, pp. 37-59, Springer, London, 2003
doi: 10.1007/1-85233-841-5_3
|
[3] |
C. Derman, G. J. Lieberman, S.M. Ross , “On the Consecutive-k-of-n: F System,” IEEE Transactions on Reliability, Vol. R-31, No. 1, pp. 57-63, 1982
doi: 10.1109/TR.1982.5221229
|
[4] |
S. Bystrov, N. Vunder, A. Ushakov, S. Vrazhevsky, S. Bystrov, N. Vunder , et al., “Design of Consecutive Compensator for Servo System with Signal Uncertainty,” in Proceedings of International Conference Mechatronics, pp. 58-64, 2018
doi: 10.1007/978-3-319-65960-2_8
|
[5] |
R. Peng and H. Xiao, “Reliability of Linear Consecutive-k-out-of-n Systems with Two Change Points,” IEEE Transactions on Reliability, Vol. 67, No. 3, pp. 1019-1029, 2018
doi: 10.1109/TR.2018.2829709
|
[6] |
M. Wang, J. Yang, H. Yu . “Reliability of Phase Mission Linear Consecutively-Connected Systems with Constrained Number of Consecutive Gaps,” in Proceedings of International Conference on System Reliability and Science IEEE, pp. 148-151, 2017
doi: 10.1109/ICSRS.2016.7815854
|
[7] |
Z. Cai, S. Si, S. Sun, C. Li , “Optimization of Linear Consecutive-k-out-of-n System with a Birnbaum Importance-based Genetic Algorithm,” Reliability Engineering & System Safety, Vol. 152, pp. 248-258, 2016
doi: 10.1016/j.ress.2016.03.016
|
[8] |
X. Zhu, M. Boushaba, M. Reghioua , “Reliability and Joint Reliability Importance in a Consecutive-k-within-m-out-of-n: F System with Markov-Dependent Components,” IEEE Transactions on Reliability, Vol. 65, No. 2, pp. 802-815, 2016
doi: 10.1109/TR.2015.2484079
|
[9] |
X. Zhu, B. Mahmoud, W. C. David, B. Azzeddine , “Reliability and Importance Measures for m-Consecutive-k, l-out-of-n System with Non-Homogeneous Markov-Dependent Components,” Reliability Engineering & System Safety, Vol. 167, pp. 1-9, 2017
|
[10] |
B. Faucher and A.S. Krausz, “Properties of Consecutive Energy Barriers and the Associated Behavior in Plastic Flow,” Journal of Applied Physics, Vol. 49, No. 7, pp. 3946-3953, 1978
doi: 10.1063/1.325404
|
[11] |
L. Råde , “A Consecutive k-out-of-n Reliability System in Random Environment,” Microelectronics Reliability, Vol. 34, No. 8, pp. 1311-1318, 1994
doi: 10.1016/0026-2714(94)90144-9
|
[12] |
I. S. Triantafyllou , “Consecutive-Type Reliability Systems: An Overview and Some Applications,” Journal of Quality & Reliability Engineering, Vol. 2015, pp. 1-20, 2015
|
[13] |
W. Zhang, C. Miller, W. Kuo , “Application and Analysis for a Consecutive-k-out-of-n: G Structure,” Reliability Engineering & System Safety, Vol. 33, No. 2, pp. 189-197, 1991
doi: 10.1016/0951-8320(91)90058-F
|
[14] |
F. Liu, Q. Chen, K. Meng, X. Zhang, W. Wei , “Consecutive and Dynamic Measuring System of Cocoon Drying Temperature and Humidity and its Practical Application,” Silk, Vol. 48, No. 4, pp. 21-23, 2011
|
[15] |
S. Eryılmaz , “Reliability Properties of Consecutive k-out-of-n Systems of Arbitrarily Dependent Components,” Reliability Engineering & System Safety, Vol. 94, No. 2, pp. 350-356, 2009
doi: 10.1016/j.ress.2008.03.027
|
[16] |
S. S. Elias, N. A Mokhles, E. M . El-Sayed, “Consecutive k-out-of-n: F System with Sequential Failures and a Single Repair,” Microelectronics Reliability, Vol. 34, No. 1, pp. 39-51, 1994
|
[17] |
A. Habib and T. Szántai, “New Bounds on the Reliability of the Consecutive k-out-of-r-from-n: F System,” Reliability Engineering & System Safety, Vol. 68, No. 2, pp. 97-104, 2000
doi: 10.1016/S0951-8320(99)00021-6
|
[18] |
M. Sfakianakis , “Optimal Arrangement of Components in a Consecutive k-out-of-r-from n: F System,” Microelectronics Reliability, Vol. 33, No. 10, pp. 1573-1578, 1993
doi: 10.1016/0026-2714(93)90111-B
|
[19] |
L. Xing and G. Levitin, “Connectivity Modeling and Optimization of Linear Consecutively Connected Systems with Repairable Connecting Elements,” European Journal of Operational Research, Vol. 264, No. 2, pp. 732-741, 2018
doi: 10.1016/j.ejor.2017.06.047
|
[20] |
K.H. Jung and H. Kim, “Linear Consecutive-k-out-of-n: F System Reliability with Common-Mode Forced Outages,” Reliability Engineering & System Safety, Vol.41, No. 1, pp. 49-55, 1993
doi: 10.1016/0951-8320(93)90017-S
|
[21] |
Y. Mo, L. Xing, S. Amari, J. Dugan , “Efficient Analysis of Multi-state k-out-of-n Systems,” Reliability Engineering & System Safety, Vol. 133, pp. 95-105, 2015
doi: 10.1016/j.ress.2014.09.006
|
[22] |
M. Zuo and M. Liang, “Reliability of Multistate Consecutively-Connected Systems,” Reliability Engineering & System Safety, Vol. 44, No. 2, pp. 173-176, 1994
doi: 10.1016/0951-8320(94)90009-4
|
[23] |
A. Habib, R.O. Al-seedy, and T. Radwan, “Reliability Evaluation of Multi-state Consecutive k-out-of-r-from-n: G System,” Applied Mathematical Modelling, Vol. 31, No. 11, pp. 2412-2423, 2007
doi: 10.1016/j.apm.2006.09.006
|
[24] |
G. Levitin , “Linear m-Gap-Consecutive k-out-of-r-from-n: F Systems,” Reliability Engineering & System Safety, Vol. 96, No. 2, pp. 292-298, 2011
|
[25] |
R. Peng, M. Xie, S.H. Ng, G. Levitin , “Element Maintenance and Allocation for Linear Consecutively Connected Systems,” IIE Transactions, Vol. 44, No. 11, pp. 964-973, 2012
doi: 10.1080/0740817X.2011.649388
|
[26] |
M. J. Zuo, D. Lin, Y. Wu , “Reliability Evaluation of Combined k-out-of-n:F, Consecutive-k-out-of-n: F and Linear Connected-(r, s)-out-of--(m, n): F System Structures,” IEEE Transactions on Reliability, Vol. 49, No. 1, pp. 99-104, 2000
doi: 10.1109/24.855542
|
[27] |
W. Kuo and M. Zuo , “Optimal Reliability Modeling: Principles and Applications,” John Wiley & Sons, New York, 2003
|