[1] G. D.Yu and C. L. Huang, “Science of Operations Equipment Support,” National University of Defense Press, Beijing, 2002 [2] G. Guastaroba and M. G. Speranza, “Kernel Search for the Capacitated Facility Location Problem,” Journal of Heuristics, Vol. 129, No. 2, pp. 877-917, 2012 [3] S. Gollowitzer, B. Gendron,I. Ljubi´c, “A Cutting Plane Algorithm for the Capacitated Connected Facility Location Problem,” Computational Optimization and Applications, Vol. 55, No. 3, pp. 647-674, 2013 [4] W. F. Wang, Y. J. Liu,B. Guo, “Research on the Armaments Repair Support Network Design Problem,” Acta Armamentarii, Vol. 29, No. 12, pp. 1501-1508, 2008 [5] J. G. Kim, H. B. Jun,C. M. Kim, “A Two-Phase Heuristic Algorithm for the Fixed-Charge Capacitated Network Design Problem with Turn Penalties,” KSCE Journal of Civil Engineering, Vol. 15, No. 6, pp. 1125-1132, 2011 [6] H. Xu and C. L. Chen, “Equipment Efficient Support Generality,” National Defend Industry Press, Beijing, 2012 [7] C. B.Li and Z. F. M hang, “Reverse Logistics Network Optimization of Integrated Location-Routing-Inventory Problem,” Computer Integrated Manufacturing Systems, Vol. 20, No. 7, pp. 1793-1798, 2014 [8] B. H. Zhao, “Research on Cloud Computing Task Scheduling Method based on Hybrid Algorithm,” Modern Electronics Technique, Vol. 39, No. 12, pp. 70-72, 2016 [9] J. X. Du, C. S. Chen, J. F. Tong,J. L. Wu, “Research on Maintain Task Scheduling of Armored Equipment Support based on Queuing Theory,” Computing Simulation, Vol. 33, No. 2, pp. 340-343, 2016 [10] J. Y. Yan, “Task Scheduling Research and Simulation of Path Selection Method,” Computing Simulation, Vol. 33, No. 6, pp. 47-51, 2016 |