1. Ren X., Li C., Ma X., Chen F., Wang H., Sharma A., Gaba G.S., andMasud M.Design of Multi-information Fusion Based Intelligent Electrical Fire Detection System for Green Buildings. Sustainability, vol. 13, no. 6, pp. 3405, 2021. 2. Si, G. Analysis on China's Electrical Fire Situation and Feature from2008 to 2012. Fire Science and Technology, vol. 33, no. 5, pp. 569-572, 2014. 3. Jun Y.Electrical Fire Risk Assessment Method Based on Multi-data Fusion. Fire Science and Technology, vol. 38, no. 4, pp. 566-569, 2019. 4. Yan X.Discussion on Uncertainty of ASET of Mega Shopping Mall. Fire Science and Technology, vol. 36, no. 12, pp. 1742-1744, 2017. 5. Wang J.Risk Assessment of Coal Mine Electrical Fire based on Fuzzy Grey Clustering Method. Coal Mine Machinery, vol. 38, no. 11, pp. 174-176, 2017. 6. Ma X.Study on Electric Fire Risk Assessment based on Hierarchical Entropy and Radar Graph. Journal of the Armed Police Academy, vol.33, no. 6, pp. 18-22+26, 2017. 7. Wang J.Risk Assessment Model for Coal Mine Electrical Fire based on PHA-LEC and Application. Coal Mine Machinery, vol. 38, no. 12, pp. 138-140, 2017. 8. Mo Z.Research on Fire Protection Design of Electrical Circuit in Super High Rise Building. Electric Power System Equipment, vol. 9, pp. 73-74, 2020. 9. Chang B.Big Store Fire Hazard Answer and Electrical Fire Risk Analysis. China Public Security.Academy Edition, vol. 2, pp. 88-91, 2010. 10. Liu, Z, Pang C., Wei J., andHe J.Index Calculation of Load Density based on IAHP and TOPSIS Methods. Automation of Electric Power Systems, vol.36, no. 13, pp. 56-59. 2012. 11. Gu, X, Tong, Z, Guo, H., Chai S., andLu Y.Target Threat Assessment for Air Combat based on TOPSIS Combining by IAHP and Entropy Weight. Huoli yu Zhihui Kongzhi, vol. 37, no. 1, pp. 69-72, 2012. 12. S, Tan, H, Peng, L, Yang.The Reason and Solution of Electrical Fire Hazard Solutions. Fire Science and Technology, vol. 33, no. 9, pp. 1081-1084, 2014. 13. Peng C.Analysis of Electrical Fire Protection Design in High Rise Buildings. Intelligent City, vol. 7, no. 5, pp. 105-106, 2021 14. Zhao H., Xiao X., Li Z., andWang Y. Estimation of Maximum Interval Hybrid Entropy of Sensitive Equipment Failure Rate Due to Voltage Sag, 2011. 15. Meacham B.Understanding Risk: Quantification, Perceptions, and Characterization. Journal of Fire Protection Engineering, vol. 14, no. 3, pp. 199-227, 2004. 16. Gong J., Hu N.L., Cui X., andWang X.Rockburst Tendency Prediction based on AHP-TOPSIS Evaluation Model. Chinese Journal of Rock Mechanics and Engineering, vol. 33, no. 7, pp. 1442-1448, 2014. 17. Ling Y., Yan Y., Li Z.et al.Establishment of Evaluation Index System for Sanitary Integrity in Public Place based on Delphi and FAHP. Soft Science of Health, vol. 35, no. 10, pp. 24-28, 2021. |