1. Yu, T.S. and Pinedo, M.Flow Shops with Reentry: Reversibility Properties and Makespan Optimal Schedules. European Journal of Operational Research, vol. 282, no. 2, pp. 478-490, 2020. 2. Dolgui A.,Hashemi-Petroodi, S.E., Kovalev, S. and Kovalyov, M.Y. Profitability of a Multi-model Manufacturing Line Versus Multiple Dedicated Lines. International Journal of Production Economics, vol. 236, pp. 108113, 2021. 3. Brammer, J., Lutz, B. and Neumann, D.Permutation Flow Shop Scheduling with Multiple Lines and Demand Plans Using Reinforcement Learning. European Journal of Operational Research., vol. 299, no. 1, pp. 75-86, 2022. 4. Dios M.,Fernandez-Viagas, V.and Framinan, J.M. Efficient Heuristics for the Hybrid Flow Shop Scheduling Problem with Missing Operations. Computers & Industrial Engineering, vol. 115, pp. 88-99, 2018. 5. Yu, C., Semeraro, Q. and Matta, A.A Genetic Algorithm for the Hybrid Flow Shop Scheduling with Unrelated Machines and Machine Eligibility. Computers & Operations Research, vol. 100, pp. 211-229, 2018. 6. Majumdar S.N.G. Enhancement of Overall Equipment Effectiveness Using Total Productive Maintenance in a Manufacturing Industry. International Journal of Performability Engineering, vol. 13, no. 2, pp. 173, 2017 7. Sarker, B.R., Jamal, A.M.M. and Mondal, S. OPtimal Batch Sizing in a Multi-stage Production System with Rework Consideration. European Journal of Operational Research, vol. 184, no. 3, pp. 915-929, 2008 8. Hadjinicola G.C.Manufacturing Costs in Serial Production Systems with Rework. Journal of the Operational Research Society, vol. 61, no. 2, pp. 342-351, 2010. 9. Al-Salamah, M. Economic Production Quantity in an Imperfect Manufacturing Process with Synchronous and Asynchronous Flexible Rework Rates. Operations research perspectives, vol. 6, pp. 100103, 2019. 10. Chiu S.W., Chen H.C., Wu H.Y. and Chiu Y.S.P. A Hybrid Finite Production Rate System Featuring Random Breakdown and Rework. Operations Research Perspectives, vol. 7, pp. 100142, 2020. 11. Colledani, M. and Angius, A.Production Quality Performance of Manufacturing Systems with In-line Product Traceability and Rework. CIRP Annals, vol. 69, no. 1, pp. 365-368, 2020 13. Lin, Y.K., Huang, D.H. and Lin, J.S.Reliability Evaluation of a Multistate Flexible Flow Shop with Stochastic Capacity for Multiple Types of Jobs. Journal of Manufacturing Systems, vol. 41, pp. 287-298, 2016 13. Wang L., Dai W., Ai J., Duan W. and Zhao Y.Reliability Evaluation for Manufacturing System Based on Dynamic Adaptive Fuzzy Reasoning Petri Net. IEEE Access, vol. 8, pp. 167276-167287, 2020 14. Yeh C.T., Lin Y.K., Yeng L.C.L. and Huang, P.T. Rail Transport Network Reliability with Train Arrival Delay: a Reference Indicator for a Travel Agency in Tour Planning. Expert Systems with Applications, vol. 189, pp. 116107, 2022 15. Huang, C.F., Huang, D.H. and Lin, Y.K.Network Reliability Evaluation for a Distributed Network with Edge Computing. Computers & Industrial Engineering, vol. 147, pp. 106492, 2020 16. Hao Z., Yeh W.C., Liu Z. and Forghani-elahabad, M. General multi-state rework network and reliability algorithm. Reliability Engineering & System Safety, vol. 203, pp. 107048, 2020 17. Lin, Y.K. and Chang, P.C.Evaluate the System Reliability for a Manufacturing Network with Reworking Actions. Reliability Engineering & System Safety, vol. 106, pp. 127-137, 2012 18. Song, W.T. and Lin, P.System Reliability of Stochastic Networks with Multiple Reworks. Reliability Engineering & System Safety, vol. 169, pp. 258-268, 2018 19. Yeh, C.T., Chang, P.C. and Chen, C.Y.Minimal Production Level and Reliability Measurement for a Maintainable Production System Under Demand and Budget Constraints. European Journal of Industrial Engineering, vol. 11, No. 4, pp. 526-547, 2017 20. White J.A.On Absorbing Markov Chains and Optimum Batch Production Quantities. AIIE Transactions, vol. 2, No. 1, pp. 82-88, 1970 21. Davis, R.P. and Kennedy Jr, W.J. Markovian Modelling of Manufacturing Systems. International Journal of Production Research, vol. 25, No. 3, pp. 337-351, 1987 22. Bowling S.R., Khasawneh M.T., Kaewkuekool S. and Cho B.R.A Markovian Approach to Determining Optimum Process Target Levels for a Multi-stage Serial Production System. European Journal of Operational Research, vol. 159, No. 3, pp. 636-650, 2004 23. Pillai, V.M. and Chandrasekharan, M.P.An Absorbing Markov Chain Model for Production Systems with Rework and Scrapping. Computers & Industrial Engineering, vol. 55, No. 3, pp. 695-706, 2008 24. Fathabadi, H.S., Khezri, S. and Khodayifar, S.A Simple Algorithm for Reliability Evaluation in Dynamic Networks with Stochastic Transit Times. Journal of Industrial and Production Engineering, vol. 32, No. 2, pp. 115-120, 2015 25. Alexopoulos C.A Note on State-space Decomposition Methods for Analyzing Stochastic Flow Networks. IEEE Transactions on Reliability, vol. 44, no. 2, pp. 354-357, 1995 26. Kumari, S. and Namasudra, S.System Reliability Evaluation Using Budget Constrained Real d-MC Search. Computer Communications, vol. 171, pp. 10-15, 2021 27. Lin, Y.K., Nguyen, T.P. and Yeng, L.C.L. Reliability Evaluation of a Stochastic Multimodal Transport Network Under Time and Budget Considerations.Annals of Operations Research, pp. 1-19, 2019 28. Nguyen, T.P. and Lin, Y.K.Reliability Assessment of a Stochastic Air Transport Network with Late Arrivals. Computers & Industrial Engineering, vol. 151, pp. 106956, 2021 |