Design of a Monitoring and Rescheduling System for Steelmaking-Continuous Casting Production
Wang Bailin,Wang Haifeng,Li Tieke
Table 4 Rescheduling data for the disturbance of processing time extension
Uncompleted Oij (33) Succeed Oij (19) Rescheduling results
O72, O13,2, O14,2O62, O16,2, O18,2, O73, O83, O93, O10,3, O11,3, O12,3, O13,3, O14,3, O15,3, O16,3, O17,3, O18,3, O63, O32, O42, O52, O15,2, O12,2, O82, O92, O10,2, O11,2, O17,2, O23, O33, O43, O53 O72, O13,2, O14,2O62, O16,2, O18,2, O73, O83, O93, O10,3, O11,3, O12,3, O13,3, O14,3, O15,3, O16,3, O17,3, O18,3, O63 O72:pt72=55;O73:st73=155;
O83:st83=l90;O93:st932=225;
O10,3:st10,3=260;O11,3:st11,3=295;
O12,3:st12,3=335