Human Reliability Evaluation of Assembly Production Line
|
Zhao Jiajia,Pang Ruying,Zhang Shuyao
|
|
|
Table 4 CPC weight table
|
|
No. | Evaluation items | Rj | Wj | 1 | Organizational integrity | 5 | 0.18 | 2 | The working conditions | 6 | 0.21 | 3 | Human-machine interface and operational support perfection | 1 | 0.04 | 4 | The cooperation of team members | 7 | 0.25 | 5 | Available time | 2 | 0.07 | 6 | Procedure/plan availability | 3 | 0.11 | 7 | Adequacy of training and experience | 4 | 0.14 | 8 | Time zone | 0 | | Total | 28 | 1 |
|
|
|