|
|
Human Reliability Evaluation of Assembly Production Line
|
Zhao Jiajia,Pang Ruying,Zhang Shuyao
|
|
|
Table 5 CPC factor weights and quantification table
|
|
No. | Evaluation items | Wj | G | J | 1 | Organizational integrity | 0.18 | 1 | | 2 | The working conditions | 0.21 | 1 | | 3 | Human-machine interface and operational support perfection | 0.04 | | | 4 | The cooperation of team members | 0.25 | 1 | | 5 | Available time | 0.07 | | -1 | 6 | Procedure/plan availability | 0.11 | | | 7 | Adequacy of training and experience | 0.14 | 1 | | 8 | Time zone | | | -1 | Total | 0.78 | -0.07 |
|
|
|