Risk Analysis of Subway Crossing Irregular-Plate Bridge and Technical Scheme of Controllable Active Pile Underpinning
Hu Yougang,He Ping
Table 5 Control parameters during the underpinning construction process
Underpinned pier column No. Jacking force/kN Mid-span relative displacement of the girder/mm Mid-span stress/MPa
17-3
(2010.10.7)
South 2333 6.0 /
North 2357
17-10
(2011.01.10)
South 2525 6.2 /
North 2522
8-3
(2011.11.9)
South 2903 5.6 97.72
North 2454
8-10
(2011.11.15)
South 2666 5.9 117.11
North 2719