Application of PAA in EPR Nuclear Power Units
Chen Wen,Wang Zhiwu,Qing Chen,Chen Shijun,Chen Jiefei,Chen Yu,Jiang Hong,Zhang Tao
Table2
Allocation of time for initial forced unavailability of main steam and main-feed water system
Power plant system
Unavailable time (empirical feedback)
Allocated unavailable time (1.4%)
Historical experience/unavailability of distribution
VVP
0.99
1.00
0.99
ARE
2.0
2.00
1.00