In view of the large manpower and financial resources required for the maintenance test of the armored equipment of the army, as well as the long acquisition period of the maintenance test data, this paper focuses on the maintenance test method based on small sample size and establishes the maintenance test verification based on the Bayes small sample theory. Assessing the model and proposing an equipment maintenance test based on this method effectively reduces the number of samples needed to validate the indicators. At the same time, it is validated with the aid of model equipment maintainability tests. The accuracy is high, and maintenance and verification are reduced. The proposed method is of great reference value for reducing the cost of equipment testing and shortening the equipment development cycle in the development of army equipment.
Keywords:
Cite this article
Chuang Li, Da Xu, Qinglong Jiao, Jieyin Huang, and Han Lin.
1. Introduction
The army armored equipment maintenance test and assessment are an important part of the army’s equipment life cycle process. At present, the verification of the army’s equipment maintainability test is usually carried out at the stage of equipment design and finalization in accordance with the methods specified in the national military standard. This method is highly accurate, but the traditional method has limitations on the number of samples, especially in the verification of quantitative indicators. The evaluation method was carried out to test, and finally reached the conclusion to determine the decision-making basis of whether the maintenance of the equipment meets the needs of the users [1-2]. The existing maintenance assessment method is limited to large samples, and the required sample size is generally at least 30[3]. With the rapid development of information technology, the complexity of armored equipment has become more sophisticated.It also involves high development costs and destructive test equipment, resulting inan increase in research and development costs, a waste of manpower and material resources, and an extension of the development cycle of equipment, making it impossible to equiptroops as early as possible[4-7].
In this context, studies based on a small sample size of the equipment maintenance test and evaluation methods are of great significance. A kid-like method based on Bayes’ theory gradually tries to apply in terms of equipment performance verification, the main aspects of aerospace, aircraft, missiles, etc. [8-10]. The application is more mature. Its biggest advantage is the ability to fully utilize the experience accumulated in the past and a variety of other prior information (expert information, similar equipmentinformation, emulation information, etc.), and combine them with a small amount of field test data on equipment maintenance for checking and evaluation [11-14].
In literature [15], Jiang and other scholars effectively solved the problem of evaluating the reliability of long-life grinding spindles in the case of small samples by using the method of Bayes’ theory and the analysis of virtual augmented samples. In literature [16], Zhang and other scholars found a method to effectively solve the reliability evaluation problem of success or failure type products under the premise of small samples by deriving the post-test probability distribution function of the reliability parameters of the success or failure type products in the Bayes pre-test distribution. In literature [17], Yin and other scholars put forward a bias verification method for the equipment testing growth model, which can be tested in the case of small sample size and different populations. The specific parameter values of the test growth model are obtained according to the historical data, which can be used to predict the equipment testability. In literature [18], Li and other scholars, in order to solve the problem of reliability verification of the wear and tear of the mechanism system under small sample sizes, extended the obtained wear data by using the small sample’s virtual augmentation method and the boot-strap method to achieve the purpose of studying the wear reliability of the mechanism system in the case of small samplesize. It was proven that the method is effective and of great application value. In addition, scholars have also studied the problem of small samples in the rest of the works and solved many problems that have historically required a large number of samples for verification.
2. Construction of Basic Model based on Bayes’ Theory Maintainability Test Method
2.1. Determine the Overall Distribution of Maintenance Time
Determining the overall distribution is the first problem to be solved in Bayesian statistical analysis. The maintenance time is a statistical distribution rather than a constant. The method of determining the overall distribution of maintenance time is to perform statistical analysis on the maintainability test data obtained through the histogram method, determine which distribution model it complies with, and then test the validity of the distribution model. This article uses the K~S test.
2.2. Pre-Inspection Information Consistency Check
Because there are many methods and equipment used during the test, equipment maintenance test information is multi-sourced, so after the historical information and field information are acquired, they must be classified, arranged, and tested for consistency. They are tested to see whether they conform to the distribution of obedience. This article uses a parametric test.
2.3. Verification of Maintainability Test based on Small Sample Size
After determining the overall distribution of the maintenance time, the following method based on Bayes’ theory is used to evaluate the mean repair time, which is based on the post-survival likelihood ratio. It obtains the decision rule by calculating the post-survival likelihood ratio, and then it determines the quantity of the field test sample according to the given two types of errors.
Set $X\tilde{\ }N(\theta ,{{\sigma }^{2}})$ , where ${{\sigma }^{2}}$ is known, or get an estimate of its accuracy from historical data, and $\theta$ is the unknown parameter of the overall distribution. Through analysis and calculation, the $\theta $ can be determined for the pretest distribution $N(\mu ,{{\upsilon }^{2}})$. The party risk $\alpha $ and the ordering party risk $\beta $ are determined by both parties, and the average repair time is verified as follows:
First make the following assumptions:
${{H}_{0}}$: $\theta ={{\theta }_{0}}$,${{H}_{1}}$: $\theta ={{\theta }_{1}}=\lambda {{\theta }_{0}}>{{\theta }_{0}},\text{ }\lambda >1$
Among them, $\lambda$ is the detection ratio, which is determined through negotiation between the contractor and the ordering party, usually$1.2\le \lambda \le 1.5$.
First, calculate the protest probability ratio of the two hypotheses:
The likelihood function:
$L(\theta )=L({{x}_{1}},{{x}_{2}},\cdots ,{{x}_{n}};\theta )=\prod\limits_{i=1}^{n}{f({{x}_{i}};\theta )}$
In the case where
$L(\theta )=L({{x}_{1}},{{x}_{2}},\cdots ,{{x}_{n}};\hat{\theta })=\underset{\theta \in \Theta }{\mathop{\max }}\,L({{x}_{1}},{{x}_{2}},\cdots ,{{x}_{n}};\theta )$
Then,$\hat{\theta }({{x}_{1}},{{x}_{2}},\cdots ,{{x}_{n}})$ is the maximum likelihood estimate of $\theta $, and $\hat{\theta }({{X}_{1}},{{X}_{2}},\cdots ,{{X}_{n}})$ is the maximum likelihood estimator of $\theta $.
$\hat{\theta }$ can be derived from the equation $\frac{\text{d}}{\text{d}\theta }L(\theta )=0$. Because $L(\theta )$ and $\ln L(\theta )$ reach extremum at the same $\theta $, the maximum likelihood estimate of $\theta $can also be obtained from the equation$\frac{\text{d}}{\text{d}\theta }\ln L(\theta )=0$.
Bayes’ formula and the above equation can be used to obtain the post-likelihood ratios of the two hypotheses:
In the case where
$\frac{P({{H}_{1}}\left| X \right.)}{P({{H}_{0}}\left| X \right.)}>1$
It is equivalent that
$\frac{1}{2{{\sigma }^{2}}}\sum\limits_{i=1}^{n}{[{{({{X}_{i}}-{{\theta }_{0}})}^{2}}-{{({{X}_{i}}-\lambda {{\theta }_{0}})}^{2}}]}-\frac{1}{2{{\upsilon }^{2}}}[{{(\lambda {{\theta }_{0}}-\mu )}^{2}}-{{({{\theta }_{0}}-\mu )}^{2}}]>0$
Transfer conversion:
$\frac{1}{{{\sigma }^{2}}}\sum\limits_{i=1}^{n}{[(1-{{\lambda }^{2}}){{\theta }_{0}}^{2}+2(\lambda -1){{\theta }_{0}}{{X}_{i}}]}>\frac{1}{{{\upsilon }^{2}}}[({{\lambda }^{2}}-1){{\theta }_{0}}^{2}+2(1-\lambda ){{\theta }_{0}}\mu ]$
And
$\frac{2(\lambda -1){{\theta }_{0}}}{{{\sigma }^{2}}}\sum\limits_{i=1}^{n}{{{X}_{i}}}>\frac{({{\lambda }^{2}}-1){{\theta }_{0}}^{2}}{{{\upsilon }^{2}}}+\frac{2(1-\lambda ){{\theta }_{0}}\mu }{{{\upsilon }^{2}}}+\frac{({{\lambda }^{2}}-1){{\theta }_{0}}^{2}}{{{\sigma }^{2}}}$
And
$\sum\limits_{i=1}^{n}{{{X}_{i}}}>\frac{(\lambda +1){{\theta }_{0}}{{\sigma }^{2}}}{2{{\upsilon }^{2}}}-\frac{\mu {{\sigma }^{2}}}{{{\upsilon }^{2}}}+\frac{(\lambda +1){{\theta }_{0}}}{2}$
And
Transform this equation to obtain an inequality:
When this inequality is established, the assumption ${{H}_{1}}$ is accepted; otherwise, the assumption ${{H}_{0}}$ is accepted. MTTR(Mean Time To Repair) data sample obeys the normal distribution
$\bar{X}\tilde{\ }N(\theta ,{{\sigma }^{2}}/n)$
And
$f(t\left| {{H}_{0}} \right.)=\frac{1}{\sqrt{2\pi }}{{e}^{-\frac{1}{2}{{(t-\frac{\sqrt{n}{{\theta }_{0}}}{\sigma })}^{2}}}}$
$f(t\left| {{H}_{1}} \right.)=\frac{1}{\sqrt{2\pi }}{{e}^{-\frac{1}{2}{{(t-\frac{\lambda \sqrt{n}{{\theta }_{0}}}{\sigma })}^{2}}}}$
In the Equation,
$t=\frac{{\bar{X}}}{\sigma /\sqrt{n}}$
According to the definition of two types of risk:
1) Producer risk:
$\alpha ={{P}_{0}}\int_{T}^{+\infty }{f(t\left| {{H}_{0}} \right.)}\text{d}t={{P}_{0}}\int_{T}^{+\infty }{\frac{1}{\sqrt{2\pi }}{{e}^{-\frac{1}{2}{{(t-\frac{\sqrt{n}{{\theta }_{0}}}{\sigma })}^{2}}}}\text{d}t}={{P}_{0}}[1-\phi (T-\frac{\sqrt{n}{{\theta }_{0}}}{\sigma })]$
2) Subscriber risk:
$\beta ={{P}_{1}}\int_{-\infty }^{T}{f(t\left| {{H}_{1}} \right.)}\text{d}t={{P}_{1}}\int_{-\infty }^{T}{\frac{1}{\sqrt{2\pi }}{{e}^{-\frac{1}{2}{{(t-\frac{\lambda \sqrt{n}{{\theta }_{0}}}{\sigma })}^{2}}}}\text{d}t}={{P}_{1}}\phi (T-\frac{\lambda \sqrt{n}{{\theta }_{0}}}{\sigma })$
In the equation, ${{P}_{0}}$ and ${{P}_{1}}$ are the pretest probability of assuming ${{H}_{0}}$ and ${{H}_{1}}$, respectively. Since the previous distribution of $\theta$ is normal distribution $N(\mu ,{{\upsilon }^{2}})$, then
From the above equation, we can get the smallest test sample:
In the formula, Z is the standard point of the normal distribution.
Substitute n with Equation (5) to get the reject field:
$\bar{X}>\frac{{{\sigma }^{2}}[(\lambda +1){{\theta }_{0}}-2\mu ]}{2n{{\upsilon }^{2}}}+\frac{{{\theta }_{0}}}{2}(\lambda +1)$
In the case where
$\bar{X}\le \frac{{{\sigma }^{2}}[(\lambda +1){{\theta }_{0}}-2\mu ]}{2n{{\upsilon }^{2}}}+\frac{{{\theta }_{0}}}{2}(\lambda +1)$
The maintenance of the equipment meets the user’s requirements and is accepted.
Because of
$\alpha <\alpha /{{P}_{0}}$,$\beta <\beta /{{P}_{1}}$
So
${{Z }_{1-\frac{\alpha }{{{P}_{0}}}}}<{{Z }_{1-\alpha }}$,${{Z }_{1-\frac{\beta }{{{P}_{1}}}}}<{{Z }_{1-\beta }}$
The following is equivalent:
${{(\frac{{{Z }_{1-\frac{\alpha }{{{P}_{0}}}}}+{{Z }_{1-\frac{\beta }{{{P}_{1}}}}}}{{{\theta }_{1}}-{{\theta }_{0}}}\sigma )}^{2}}<{{(\frac{{{Z }_{1-\alpha }}+{{Z }_{1-\beta }}}{{{\theta }_{1}}-{{\theta }_{0}}}\sigma )}^{2}}$
The right side of the formula is the amount of test samples required by the traditional method. Through the analysis of this, it can be seen that the small sample method based on Bayes’ theory makes full use of the pre-inspection information, which greatly reduces the number of samples in the field test. The sample size determined by this method is about 1/10 of the sample size required by the traditional method, which fully reflects the superiority of the small sample method based on Bayes’ theory.
3. Example Verification
This article will verify the method by collecting maintenance test data from a certain pilot plant of the army. In order to control the variables from other conditions, the selected data will eliminate the influence of other unfavourable factors such as the environment and obtain the test data under normal circumstances. The following are the statistics for the maintenance time of subsystems of a certain type of equipment, including historical data and field data (unit: hour):
Historical data: 0.5, 0.5, 0.4, 0.6, 1.1, 0.6, 1, 0.6, 0.3, 0.4, 1, 0.5, 0.55, 0.5, 0.8.
Field data: 0.4, 1.5, 0.5, 0.4, 0.8, 0.4, 0.6, 1, 0.8, 0.6.
3.1. Determine the Data Distribution Type
First determine the historical maintenance time data distribution mode. Assume that the historical maintenance time is Y,$Y=({{y}_{1}},\cdots ,{{y}_{n}})$, and set $X=\ln Y=({{x}_{1}},\cdots ,{{x}_{n}})$.As long as the check X obeys the normal distribution, you can determine whether Y obeys the log normal distribution.Historical data is converted by the equation .
Y=(0.5, 0.5, 0.4, 0.6, 1.1, 0.6, 1, 0.6, 0.3, 0.4, 1, 0.5, 0.55, 0.5, 0.8)
X= (-0.6932, -0.6932, -0.9163, -0.5108, 0.0953, -0.5108, 0, -0.5108, -1.204, -0.9163, 0, -0.6932, -0.5978, -0.6932, -0.2231)
From the historical data, the minimum value in the data is 0.3, and the maximum value is 1.1. When the upper and lower bounds of the set histogram are set, the value of the lower limit data is 0.2, which is recorded as a=0.2, and the upper limit data is 1.2, which is recorded as b=1.2. According to the empirical function, the number of score groups is $K=1+3.32\ln n=10$ (n=15, n is the sample capacity), so that the interval between intervals can be $\Delta =\frac{b-a}{k}=0.1$.
According to the data distribution after grouping, the maintenance time can be preliminarily determined to be log normal distribution, and then the K~S test method is used to test the validity of the distribution model.
Testing whether $X$ obeys normal distribution, that is, whether $X\tilde{\ }N(\mu ,{{\sigma }^{2}})$ is valid, we can determine whether Y obeys the logarithmic normal distribution.
First, the unbiased estimates for $\mu $ and ${{\sigma }^{2}}$ are as follows:
$\hat{\mu }=\bar{X}=\frac{1}{15}\sum\limits_{i=1}^{15}{{{x}_{i}}}=-0.5378$, ${{\hat{\sigma }}^{2}}=\frac{1}{14}\sum\limits_{i=1}^{15}{{{({{x}_{i}}-\bar{X})}^{2}}}=0.1274$
The sample values are arranged according to the order from small to large. According to the K~S test table, it can be estimated to be ${{\hat{D}}_{n}}=0.1367$.The significance level is $\alpha =0.2$. Check the K~S critical value table and obtain ${{\hat{D}}_{n\alpha }}=0.177$.
Therefore,
${{\hat{D}}_{n}}<{{\hat{D}}_{n\alpha }}$
Assuming the original hypothesis, we can confirm that X obeys the normal distribution, that is, the maintenance time Y obeys the logarithmic normal distribution.
According to this method, it can be determined that the on-site maintenance time also obeys the log normal distribution. It can be determined that the maintenance time of the equipment is generally subject to a log normal distribution.
3.2. Pre-Inspection Information Consistency Check based on the Example
Because it has been proven that the maintenance time obeys the log normal distribution, only the parameter verification needs to be performed. Historical data and field data are usually taken as logarithms (remembered as ${{X}_{1}}$ and ${{X}_{2}}$) for research, which translates into a normal distribution for further study. The following uses the parametric test to verify.
According to the sample data, replacing $\mu $, ${{\sigma }^{2}}$ with an unbiased estimate of $\mu $, ${{\sigma }^{2}},$the following conclusions can be drawn:
${{n}_{1}}=15$, ${{n}_{2}}=10$, ${{\bar{X}}_{1}}=-0.5378$, ${{S}_{1}}^{2}=0.1274,$${{\bar{X}}_{2}}=-0.4505$, ${{S}_{2}}^{2}=0.1756$
The given level of saliency is 0.1.
First, test the variance:
${F}'=\frac{{{n}_{1}}({{n}_{2}}-1){{S}_{1}}^{2}}{{{n}_{2}}({{n}_{1}}-1){{S}_{2}}^{2}}=0.6995$
Given a significance level of 0.1, you can find F0.05 and F0.95 by consulting the distribution table:
${{F}_{0.05}}(14, 9)=0.333$,${{F}_{0.95}}(14, 9)=2.65$
We can see that ${{F}_{0.05}}(14, 9)<{F}'<{{F}_{0.95}}(14, 9)$, and there is no difference in their variance. Next, check the mean:
${t}'=\frac{{{{\bar{X}}}_{1}}-{{{\bar{X}}}_{2}}}{\sqrt{\frac{{{n}_{1}}{{S}_{1}}^{2}+{{n}_{2}}{{S}_{2}}^{2}}{{{n}_{1}}+{{n}_{2}}-2}}\sqrt{\frac{1}{{{n}_{1}}}+\frac{1}{{{n}_{2}}}}}=-0.108$
Given a significance level of 0.1, you can find that ${{t}_{0.05}}(15+10-2)=1.7139$ by consulting the distribution table.We can see that
$-{{t}_{0.05}}(23)<{t}'<{{t}_{0.05}}(23)$
Therefore, there is no difference in their average values.Based on the above verification, it can be determined that the historical data and the field data are in good agreement.
3.3. Analysis and Verification
The repair time is $Y$, $X=\ln Y$, and from the above analysis we can see that $X$ obeys the normal distribution. set $X\tilde{\ }N(\theta ,{{\sigma }^{2}})$, where the variance is estimated from historical dataas${{\tilde{\sigma }}^{2}}=0.1951$,$\theta$ is an unknown parameter for the overall distribution, and $\theta \tilde{\ }\pi (\theta )=N(\mu ,{{\upsilon }^{2}})$$=N(-0.5342, 0.0083)$.According to the contract, the mean time to repair (MTTR) indicator value is 0.65 hours, and then ${{\theta }_{0}}$ can be obtained:
${{\theta }_{0}}=\ln 0.65-\frac{1}{2}\times 0.1951=-0.5283$
In addition, giving the contractor risk $\alpha =0.2$ and subscriber risk $\beta =0.15$, the detection ratio is agreed by the contractor and the ordering party as $\lambda =1.4$, which is equivalent to ${{\theta }_{1}}=1.4{{\theta }_{0}}$.
In the following, the average repair time is verified according to the post-survival likelihood ratio verification method.
Set: H0: θ=θ0, H1: θ=θ1=1.4θ0
First, calculate the pretest probability ratio of the two hypotheses:
$\frac{P(\theta ={{\theta }_{1}})}{P(\theta ={{\theta }_{0}})}={{\text{e}}^{\{-\frac{1}{2\times 0.0083}[{{(-0.5283\times 1.4+0.5342)}^{2}}-{{(-0.5283+0.5342)}^{2}}]\}}}=0.9607$
The post-likelihood ratios of the two hypotheses can be calculated by the Bayesian formula and the above formula.
Since the pre-distribution of the $\theta $ isa normal distribution $N(\mu ,{{\upsilon }^{2}})$, the following conclusions are drawn according to Equation (7) and Equation (8):
${{P}_{0}}=\int_{-\infty }^{{{\theta }_{0}}}{\frac{1}{\sqrt{2\pi }\upsilon }{{e}^{-\frac{{{(\theta -\mu )}^{2}}}{2{{\upsilon }^{2}}}}}\text{d}\theta }=\int_{-\infty }^{-0.5283}{\frac{1}{\sqrt{2\pi }\times \sqrt{0.0083}}}{{e}^{-\frac{{{(\theta +0.5342)}^{2}}}{2\times 0.0083}}}\text{d}\theta =0.5832$
${{P}_{1}}=1-{{P}_{0}}=0.4168$
The above equation can be used to calculate the minimum sample size required for the test:
$n={{(\frac{{{Z }_{1-\frac{\alpha }{{{p}_{0}}}}}+{{Z }_{1-\frac{\beta }{{{p}_{1}}}}}}{{{\theta }_{1}}-{{\theta }_{0}}}\sigma )}^{2}}={{(\frac{{{Z}_{1-\frac{0.2}{0.5832}}}+{{Z}_{1-\frac{0.15}{0.4168}}}}{-0.5283\times 0.4}\times \sqrt{0.1951})}^{2}}=4.4315$
n takes an integer of 5, so only five field data are needed.Substituting n into the equation:
$\bar{X}>\frac{{{\sigma }^{2}}[(\lambda +1){{\theta }_{0}}-2\mu ]}{2n{{\upsilon }^{2}}}+\frac{{{\theta }_{0}}}{2}(\lambda +1)$
The rejected field can be obtained:
$\bar{X}>\frac{{{\sigma }^{2}}[(\lambda +1){{\theta }_{0}}-2\mu ]}{2n{{\upsilon }^{2}}}+\frac{{{\theta }_{0}}}{2}(\lambda +1)=1.1026$
If the condition $\bar{X}\le 1.1026$ is satisfied, the maintainability of the equipment is deemed to be acceptable by the user.Typically, five samples from the field data are compared with the rejection field to derive its average value.
Five samples:0.4, 0.5, 0.8, 0.6, 0.8.
The average of these five numbers:
$\bar{X}=(\ln 0.4+\ln 0.5+\ln 0.8+\ln 0.6+\ln 0.8)/5=-0.5132$
And
$\bar{X}<1.1026$
Therefore, the maintainability of the equipment is tested to meet the user’s requirements.If the method used in the national military standard is adopted, at least 30 field data are required. It can be seen that the sample size is greatly reduced by this method, and the superiority of the method is fully explained.
4. Conclusions
This paper analyses in detail the problems of existing assessment methods and proposes a small sample validation method based on Bayesian theory in view of the large sample size, inaccurate processing of test data, and missing data in existing assessment methods. The principle and steps of this method are mainly studied. Finally, specific examples are used to fully verify the method. Compared with the existing methods, the superiority of this method is proven. Under the condition of insufficient maintenance test data, it has important guiding significance for equipment maintainability evaluation.
Reference
“Evaluation of Complex Equipment Testability based on Mixed Prior Distribution, ”
, Vol.DOI:10.16450/j.cnki.issn.1004-6801.2015.04.016 URL [Cited within: 1]
It is of great importance to useany prior information effectively and reasonably in the evaluation of small samples.Therefore, a new testability evaluation method based on mixed Beta prior distribution is presented, while considering both the credibility and the importance of prior information as well as the testability evaluation of complex equipment in small samples.The results show that, according to classical methods using small binomial samples, the lowerconfidence limits of product testability are conservative.Most of the measurements for the credibility of the prior information are based on data.The evaluation results are aggressive due to the missing sources of prior information.Thus, the conclusion is reasonable, and this method is promising for engineering applications.
“Determination Method of Acceleration Factor based on Life Distribution and Bayes, ”
,Vol.DOI:10.3969/j.issn.1001-506X.2015.05.39 URL [Cited within: 1]
The acceleration factor is difficult to determine for small sample products, a determination method of acceleration factors, based on life distribution and Bayes, is proposed.First, according to the stored data information of similar products within the field under normal stress, obtain the value of the distribution parameters of the product life by maximum likelihood estimation(MLE),then use the Fisher information matrix inversion to obtain its variance-covariance matrix, and eventually get the distribution of life distribution parameters.Then, based on the testing information of small sample researching products under accelerated stress, combine some priori information, such as the accelerated stress test information of similar products and expert experience, and use the ML- method for determining the weight of a mixed prior distribution.The posterior distribution of the distribution parameters of product life can be achieved by the Bayes method.Finally, by combining with distribution information distribution parameters of the product life under the normal stress and accelerated stress, acquire the acceleration factor.Taking an accelerometer as an example, the correctness and the validity of the proposed method are proved.
“Research on the Maintenance Test and Evaluation Method for Small Samples of Weapons and Equipment, ”
, Vol.
“E-Bayesian Estimation Method of Parameter and its Ap-Plicationsin Reliability Engineering, ”
, Vol.
“Evaluation of Missile Guidance Precision based on Hybrid Prior Distribution, ”
, Vol.
“Bayesian Modified Power Prior Approach for Product Reliability Assessment with Only Safe-or Failure Pattern, ”
, Vol.DOI:10.1145/1651587.1651601 URL
How to use prior information effectively and reasonably in Bayesian method is a critical problem in small sample evaluation. For evaluation of product reliability with only safe-or-failure pattern, the power prior parameter is introduced to control the effect of the prior information acting on the post estimation, and post density function of reliability panameter by Bayesian method deduced detailedly based on the modified power prior distribution.By using the new method, the scene that the prior data inundate the post data can be avoided effectively through analyzing the posterior estimation of interesting parameters at the same time, and the power parameter can be obtained from posterior marginal distribution.Some elementary principles about using the prior data have been put forward through calculating the mean square error of post estimation.
“Research on System Reliability Competition Model based on Small Sample Multiple Failure Modes, ”
,Vol.
“Bayes Assessment for Reliability of Success or Failure Product in the Development Phases, ”
, Vol.
“Research Status on Weapon Equipment Maintainability Verification Test Method, ”
, Vol.
“Sensitivity Analysis of Objective Bayesian Evaluation under Random Right Censoring and Weilbull Distribution, ”
,Vol.
“Bayes-Ian Analysis based on Dirichlet Prior Distribution of Dominant Failure Modes for Electromechanical Products, ”
, Vol.
“Extremely Small Sample’S Reliability of a Motorized Spindle based on Bayes Method, ”
,Vol.
“Reliability Assessment for Device with Only Safe-or-Failure Pattern based on Bayesian Hybrid Prior Approach, ”
, Vol.
“Bayesian Verification Method based on Equipment Testability Growth, ”
, Vol.
“Reliability Research on the Mechanism System Wear Simulation under the Case of the Small-Scale Sample, ”
, Vol.DOI:10.3901/JME.2015.13.235 URL [Cited within: 1]
Considering the characteristics that the circuit breaker mechanism system wear data is a small-scale sample, the failure threshold is not fixed and the experiment cost is very high, the simulation test method, the small-scale sample data processing method and random theory are used to research on the wear reliability of the large capacity generator breaker transmission mechanism.On the basis of considering kinematic pair irregular wear on the circuit breaker transmission system and the manufacturing error, the depth of wear on the kinematic pair different contact points is calculated based on Archard wear model, and the wear data under the case that the initial clearances of the dangerous joint kinematic pair in the circuit transmission mechanism follow normal distribution is got through ADAMS simulation software.The post-expansion data is obtained with the methods of the virtual augmentation method and boot-strap method, the reliability function curve before and after expansion of the circuit breaker are got separately according to the distribution law of circuit breaker mechanism system wear amount, the results after comparison show that the small-scale expansion is necessary.The reliability function curves under the cases of fixed threshold and random threshold are obtained separately by using the post-expansion wear data, and the comparison results show that the reliability under random threshold is more close to the actual production.The research indicates that the simulation test can be used to predicate the reliability of the complex wear process, which can avoid the traditional research method relying on the experiment, and the analytical method has certain rationality.
“Uncertainty Quantification in Low Cycle Fatigue Life Model based on Bayesian Theory, ”
, Vol.
“Extreme-Small-Sample Accelerated Test Method based on Segmented Section Step-Stress Experimental Principle in Life Cycle, ”
, Vol.
/
〈 | 〉 |